Logo
Home Activities Projects MF Chart Architectural Competition Contact Us
Back to Group            
Operation and Maintenance
Engineering Services
Training and GIS
Construction and Instation
Al-Talbiaya Bridge

Construction of a bridge in Baghdad has been awarded to GHADAK and AL-Oussi Co. for design and build. It is a box-grade design, to be completed within nine months. Form scaffolding by Peri has been imported from Germany for that purpose the work still in progress with 73% completed work has been archived in three months.

Narrative Description of Project:
the scope of work in design and built Talbia bridge in Baghdad over army canal. Description of Actual services Provided by
Your Staff: our staff made the followings :Site topographic survey by total station instruments.Geometric design of bridge
Architectural design of bridgeCivil and structural designElectrical designSanitary design Construct the bridge

Assignment Name:Talbiya bridge construction Country: Iraq

Location within Country:Baghdad Professional Staff Provided by Your Firm/entity (profiles):
See attach II (CV's)
Name of Client: Amanat Baghdad No. of Staff:
Address: No. of Staff-Months; duration of assignment:
Start Date (Month/Year):Jan.2005 Completion Date (Month/Year): Approximate Value of Services (in Current US$):
Name of Associated Consultants, if any:Arab contractor company . No. of Months of Professional Staff provided by Associated Consultants:270
Name of Senior Staff (Project Director/Co-ordinator, Team Leader) involved and functions performed:
Dr. Kamal .A. Yass - Team Leader
Dr. Khalid I. Ibrahim - Project Manager
Eng Firas Al-Soodani - Quality Control
Eng Maysam Yassen – Document Controll
Narrative Description of Project:
Description of Actual services Provided by Your Staff:

 

 
Home | Activities | Projects | MF Chart | Architectural Competition | Contact Us
Copyright © 2007 - Ghadak For Consulting Engineering & General Contracts - All rights reserved - Designed by Orinet