This project consists of the following:
  1. Two Major roads (Kesra wa atash and Misan) was resurfaced and reconstructed. Kesra wa atash 6km length is two carriageway with three lanes each total width 24 m including 2m walkway. The total surface area is about 120000 m square. Misan Road 6km length is two carriages way with three lanes each total width is 24 m including 2 m walk-way. The total surface area is about 900000m square.
  2. Combined storm drains and a sewer line was repaired and completely reconstructed in the above roads. The total length is of 8600m dia from 400mm up to 1000mm.
  3. The Roadwork: Kesra wa atash and Canal Embankment: Two lanes of Kesra wa atash was repaved and reconstructed from Kesra wa atash extended up to the bridge as required. The total surface area is of 60000 m square.
  4. Kesra wa atash between Misan and Al-Sedda: this roadway was replaced and the subsurface was repaired. The total surface area is of 40000 m square.
  5. Kesra wa atash between Misan and Al-Kudis: this roadway was resurfaced total area of 35000 m sequare.
  6. Intersection of Misan and Kesra Wa Atash: A traffic circle was constructed and the roadway was resurfaced at this location. Misan between Kesra wa atash.
  7. Al-Shahid: the roadway was resurfaced and the curbs were repaired.
  8. 5000 m length storm and sewer line were maintained with a diameter of 500 mm and 600 mm.
Sadr City

To rehabilitate the sewer system and roadways in the following locations, the sewers and drainage lines of Al-Shahid, between Al-Sedda and Al-Kaiar had to be repaired. The total length of this project is 7500m dia from 600mm up to 800mm.

Roadworks:
  • Intersection of routes Al-Sedda and Orfali, this road is to be straightened and a roundabout installed as a traffic flow control feature. This required new road construction including subsurface, wearing surface and curbing. Total length is 2400m surface area of 28000 m square.
  • Orfali between Al-Sedda and Al-Kudis, this road was transition from new road construction to the repair of potholes and reflective cracks where needed.
  • Al-Shahid between Al-Sedda and Al-Kaiar, and Al-Kaiar between Kesra wa atash and Orfali: The entire length of these routes was repaved and repaired down to the subsurface as necessary. Total surface area is 130000 m square.

 
Home | Activities | Projects | MF Chart | Architectural Competition | Contact Us
Copyright © 2007 - Ghadak For Consulting Engineering & General Contracts - All rights reserved - Designed by Orinet